{"id":3830,"date":"2025-12-11T03:17:22","date_gmt":"2025-12-11T03:17:22","guid":{"rendered":"https:\/\/tophighmachinery.com\/?p=3830"},"modified":"2025-12-19T00:25:37","modified_gmt":"2025-12-19T00:25:37","slug":"how-much-space-do-i-need-to-set-up-a-block-making-factory","status":"publish","type":"post","link":"https:\/\/tophighmachinery.com\/es-mx\/how-much-space-do-i-need-to-set-up-a-block-making-factory\/","title":{"rendered":"\u00bfCu\u00e1nto espacio necesito para establecer una f\u00e1brica de fabricaci\u00f3n de bloques?"},"content":{"rendered":"\n<div class=\"wp-block-uagb-image uagb-block-9f1bbfe2 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/12\/3d-design-factory--1024x724.jpg ,https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/12\/3d-design-factory-.jpg 780w, https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/12\/3d-design-factory-.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/12\/3d-design-factory--1024x724.jpg\" alt=\"\" class=\"uag-image-3614\" width=\"1024\" height=\"724\" title=\"3d design factory\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Calculando el Plan Espacial para una Planta de Bloques<\/h3>\n\n\n\n<p>El &aacute;rea total requerida es la suma de varias zonas interconectadas. Una f&aacute;brica bien dise&ntilde;ada facilita un flujo de material lineal y fluido, desde la entrada de materia prima hasta el despacho del producto terminado.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">1. Zona de Producci&oacute;n Principal: El Coraz&oacute;n de las Operaciones<\/h4>\n\n\n\n<p>Esta zona alberga la maquinaria principal y los procesos inmediatos.<\/p>\n\n\n\n<h5 class=\"wp-block-heading\">1.1. Huella de la Maquinaria y Espacio Operativo<\/h5>\n\n\n\n<p>Comience con las especificaciones del fabricante para la propia m&aacute;quina de bloques, incluyendo largo, ancho y alto. Es fundamental que agregue detalles importantes.<strong>Autorizaci&oacute;n operativa<\/strong><span class=\"mars-pro\" data-o=\"&nbsp;on all sides. This space is needed for:\">&nbsp;on all sides. This space is needed for:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><span class=\"mars-pro\" data-o=\"Maintenance access to all parts of the machine.\">Maintenance access to all parts of the machine.<\/span><\/li>\n\n\n\n<li><span class=\"mars-pro\" data-o=\"Safe movement of personnel and small tools.\">Safe movement of personnel and small tools.<\/span><\/li>\n\n\n\n<li><span class=\"mars-pro\" data-o=\"Ample room for the movement of the product conveyor or transfer system.\">Ample room for the movement of the product conveyor or transfer system.<\/span><br><span class=\"mars-pro\" data-o=\"As a rule, the area dedicated to the machine and its immediate workspace should be at least 2.5 to 3 times the machine&rsquo;s own footprint.\">As a rule, the area dedicated to the machine and its immediate workspace should be at least 2.5 to 3 times the machine&rsquo;s own footprint.<\/span><\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"1.2. Raw Material Feeding and Mixing Area\">1.2. Raw Material Feeding and Mixing Area<\/span><\/h5>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"Adjacent to the machine is the batching and mixing station. Space must accommodate:\">Adjacent to the machine is the batching and mixing station. Space must accommodate:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><span class=\"mars-pro\" data-o=\"Aggregate Bays:\">Aggregate Bays:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Separate, walled compartments for storing different grades of sand and aggregate. The number and size depend on daily consumption and delivery frequency.\">&nbsp;Separate, walled compartments for storing different grades of sand and aggregate. The number and size depend on daily consumption and delivery frequency.<\/span><\/li>\n\n\n\n<li><strong><span class=\"mars-pro\" data-o=\"Cement Silo:\">Cement Silo:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;A towering structure requiring a stable foundation and clearance for bulk tanker delivery trucks.\">&nbsp;A towering structure requiring a stable foundation and clearance for bulk tanker delivery trucks.<\/span><\/li>\n\n\n\n<li><strong><span class=\"mars-pro\" data-o=\"Water Tank and Additive Storage:\">Water Tank and Additive Storage:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Space for tanks and chemical containers.\">&nbsp;Space for tanks and chemical containers.<\/span><\/li>\n\n\n\n<li><strong>Mezcladora de Concreto:<\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Positioned to easily receive materials and discharge mix to the block machine&rsquo;s feeder.\">&nbsp;Positioned to easily receive materials and discharge mix to the block machine&rsquo;s feeder.<\/span><\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"2. Curing and Drying Zone: The Critical Patience Chamber\">2. Curing and Drying Zone: The Critical Patience Chamber<\/span><\/h4>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"This is often the most space-intensive part of the operation.\">This is often the most space-intensive part of the operation.<\/span><\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"2.1. Curing Rack Systems\">2.1. Curing Rack Systems<\/span><\/h5>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"After molding, blocks on pallets must be stored for initial setting and strength gain. This requires:\">After molding, blocks on pallets must be stored for initial setting and strength gain. This requires:<\/span><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><span class=\"mars-pro\" data-o=\"Green Block Storage:\">Green Block Storage:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Space for racks to hold freshly produced blocks for 24-48 hours.\">&nbsp;Space for racks to hold freshly produced blocks for 24-48 hours.<\/span><\/li>\n\n\n\n<li><strong><span class=\"mars-pro\" data-o=\"Curing Area:\">Curing Area:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;If using steam curing chambers or rooms, these enclosed structures require significant floor space and height. If using natural curing, a vast, covered area is needed to protect blocks from sun and rain while allowing air circulation.\">&nbsp;If using steam curing chambers or rooms, these enclosed structures require significant floor space and height. If using natural curing, a vast, covered area is needed to protect blocks from sun and rain while allowing air circulation.<\/span><br><span class=\"mars-pro\" data-o=\"Adequate aisle space between racks for forklifts or stackers is non-negotiable for efficiency and safety.\">Adequate aisle space between racks for forklifts or stackers is non-negotiable for efficiency and safety.<\/span><\/li>\n<\/ul>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"2.3. Drying and Final Storage\">2.3. Drying and Final Storage<\/span><\/h5>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"After curing, blocks need additional drying time to reach optimal shipping moisture content. This requires another large, covered storage area, logically positioned before the loading bay.\">After curing, blocks need additional drying time to reach optimal shipping moisture content. This requires another large, covered storage area, logically positioned before the loading bay.<\/span><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"3. Logistics and Ancillary Zones: Supporting the Flow\">3. Logistics and Ancillary Zones: Supporting the Flow<\/span><\/h4>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"3.1. Raw Material Reception and Storage (External)\">3.1. Raw Material Reception and Storage (External)<\/span><\/h5>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"Adequate yard space is required for delivery trucks to maneuver, dump aggregates, and for the front-end loader to operate. This includes space for a backup stockpile of aggregates.\">Adequate yard space is required for delivery trucks to maneuver, dump aggregates, and for the front-end loader to operate. This includes space for a backup stockpile of aggregates.<\/span><\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"3.2. Finished Product Storage Yard\">3.2. Finished Product Storage Yard<\/span><\/h5>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"This is the staging area for orders ready for dispatch. It must be organized to allow efficient loading of customer trucks. The required size is a direct function of production capacity and sales volatility; a plant building to stockpile inventory will need a much larger yard than one operating on strict just-in-time orders.\">This is the staging area for orders ready for dispatch. It must be organized to allow efficient loading of customer trucks. The required size is a direct function of production capacity and sales volatility; a plant building to stockpile inventory will need a much larger yard than one operating on strict just-in-time orders.<\/span><\/p>\n\n\n\n<h5 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"3.3. Ancillary Spaces\">3.3. Ancillary Spaces<\/span><\/h5>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong><span class=\"mars-pro\" data-o=\"Power Substation:\">Power Substation:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Dedicated, secure space for electrical panels, transformers, and generators.\">&nbsp;Dedicated, secure space for electrical panels, transformers, and generators.<\/span><\/li>\n\n\n\n<li><strong><span class=\"mars-pro\" data-o=\"Maintenance Workshop:\">Maintenance Workshop:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;A small bay for repairing pallets, fixing machinery parts, and storing tools.\">&nbsp;A small bay for repairing pallets, fixing machinery parts, and storing tools.<\/span><\/li>\n\n\n\n<li><strong><span class=\"mars-pro\" data-o=\"Office and Staff Facilities:\">Office and Staff Facilities:<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;Basic administrative space and amenities for workers.\">&nbsp;Basic administrative space and amenities for workers.<\/span><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"Conclusion: Space as a Strategic Asset, Not Just a Cost\">Conclusion: Space as a Strategic Asset, Not Just a Cost<\/span><\/h3>\n\n\n\n<p><span class=\"mars-pro\" data-o=\"In conclusion, determining the space for a block making factory is an exercise in strategic planning that directly impacts operational efficiency, scalability, and long-term profitability. The guiding principle should be&nbsp;\">In conclusion, determining the space for a block making factory is an exercise in strategic planning that directly impacts operational efficiency, scalability, and long-term profitability. The guiding principle should be&nbsp;<\/span><strong><span class=\"mars-pro\" data-o=\"material flow efficiency\">material flow efficiency<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;over mere minimization of square footage. For a distributor or consultant, the goal is to help the client visualize not just a machine in a shed, but a complete ecosystem where raw materials enter one end and finished blocks exit the other with minimal backtracking or congestion. Recommending a layout that includes reasonable space buffers for each functional zone is an investment in the plant&rsquo;s future resilience. A well-planned factory, with room for an additional curing rack, a future second production line, or expanded raw material storage, provides the agility to capitalize on market growth. Ultimately, the right amount of space is the foundation upon which a safe, productive, and competitive business is built.\">&nbsp;over mere minimization of square footage. For a distributor or consultant, the goal is to help the client visualize not just a machine in a shed, but a complete ecosystem where raw materials enter one end and finished blocks exit the other with minimal backtracking or congestion. Recommending a layout that includes reasonable space buffers for each functional zone is an investment in the plant&rsquo;s future resilience. A well-planned factory, with room for an additional curing rack, a future second production line, or expanded raw material storage, provides the agility to capitalize on market growth. Ultimately, the right amount of space is the foundation upon which a safe, productive, and competitive business is built.<\/span><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"mars-pro\" data-o=\"Frequently Asked Questions (FAQ)\">Frequently Asked Questions (FAQ)<\/span><\/h3>\n\n\n\n<p><strong><span class=\"mars-pro\" data-o=\"Q1: What is a realistic total area range for a start-up block plant?\">Q1: What is a realistic total area range for a start-up block plant?<\/span><\/strong><br><span class=\"mars-pro\" data-o=\"A1: For a semi-automatic to fully automatic plant with a moderate daily output (e.g., 5,000 &ndash; 10,000 blocks), a total enclosed and yard space of&nbsp;\">A1: For a semi-automatic to fully automatic plant with a moderate daily output (e.g., 5,000 &ndash; 10,000 blocks), a total enclosed and yard space of&nbsp;<\/span><strong><span class=\"mars-pro\" data-o=\"8,000 to 15,000 square meters\">8,000 to 15,000 square meters<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;is a common starting point. Smaller, manual operations may function on 2,000-3,000 sqm, while large, fully automated factories with high inventory may require 20,000+ sqm.\">&nbsp;is a common starting point. Smaller, manual operations may function on 2,000-3,000 sqm, while large, fully automated factories with high inventory may require 20,000+ sqm.<\/span><\/p>\n\n\n\n<p><strong><span class=\"mars-pro\" data-o=\"Q2: How critical is ceiling height?\">Q2: How critical is ceiling height?<\/span><\/strong><br><span class=\"mars-pro\" data-o=\"A2: Extremely critical, especially in the curing and storage zones. Standard industrial racks can be 4-5 levels high. A minimum clear ceiling height of&nbsp;\">A2: Extremely critical, especially in the curing and storage zones. Standard industrial racks can be 4-5 levels high. A minimum clear ceiling height of&nbsp;<\/span><strong><span class=\"mars-pro\" data-o=\"6-8 meters\">6-8 meters<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;is often required to utilize vertical space efficiently with forklifts or stackers. The production hall housing the machine must also accommodate the machine&rsquo;s height and any overhead conveyors.\">&nbsp;is often required to utilize vertical space efficiently with forklifts or stackers. The production hall housing the machine must also accommodate the machine&rsquo;s height and any overhead conveyors.<\/span><\/p>\n\n\n\n<p><strong><span class=\"mars-pro\" data-o=\"Q3: What are the most common spatial planning mistakes?\">Q3: What are the most common spatial planning mistakes?<\/span><\/strong><br><span class=\"mars-pro\" data-o=\"A3: Key mistakes include: underestimating curing\/storage space (which becomes the bottleneck); failing to provide adequate truck maneuvering room; placing raw material storage too far from the mixer; and having no room for maintenance or future equipment. Poor aisle width planning that hinders material handling is also frequent.\">A3: Key mistakes include: underestimating curing\/storage space (which becomes the bottleneck); failing to provide adequate truck maneuvering room; placing raw material storage too far from the mixer; and having no room for maintenance or future equipment. Poor aisle width planning that hinders material handling is also frequent.<\/span><\/p>\n\n\n\n<p><strong><span class=\"mars-pro\" data-o=\"Q4: Does the type of block product affect space needs?\">Q4: Does the type of block product affect space needs?<\/span><\/strong><br><span class=\"mars-pro\" data-o=\"A4: Absolutely. Producing large, solid blocks or heavy retaining wall units results in a lower unit count per square meter of storage. Producing small pavers or hollow blocks allows for denser storage. A product mix with long curing times (like certain paving stones) will also increase the need for curing space.\">A4: Absolutely. Producing large, solid blocks or heavy retaining wall units results in a lower unit count per square meter of storage. Producing small pavers or hollow blocks allows for denser storage. A product mix with long curing times (like certain paving stones) will also increase the need for curing space.<\/span><\/p>\n\n\n\n<p><strong><span class=\"mars-pro\" data-o=\"Q5: How should a client approach buying or leasing land based on this?\">Q5: How should a client approach buying or leasing land based on this?<\/span><\/strong><br><span class=\"mars-pro\" data-o=\"A5: Advise clients to finalize their core equipment choice and create a preliminary layout&nbsp;\">A5: Advise clients to finalize their core equipment choice and create a preliminary layout&nbsp;<\/span><em>antes<\/em><span class=\"mars-pro\" data-o=\"&nbsp;securing land. Use the calculated total area, then add a&nbsp;\">&nbsp;securing land. Use the calculated total area, then add a&nbsp;<\/span><strong><span class=\"mars-pro\" data-o=\"25-35% buffer zone\">25-35% buffer zone<\/span><\/strong><span class=\"mars-pro\" data-o=\"&nbsp;for unforeseen needs, expansion, and ancillary functions like parking. Prioritize sites with room for expansion on at least one side. Securing a slightly larger plot at the outset is almost always more cost-effective than relocating a constrained operation later.\">&nbsp;for unforeseen needs, expansion, and ancillary functions like parking. Prioritize sites with room for expansion on at least one side. Securing a slightly larger plot at the outset is almost always more cost-effective than relocating a constrained operation later.<\/span><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-365e9907 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/11\/qt10-15-automatic-block-machin20-1024x683.jpg ,https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/11\/qt10-15-automatic-block-machin20-scaled.jpg 780w, https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/11\/qt10-15-automatic-block-machin20-scaled.jpg 360w\" sizes=\"auto, (max-width: 480px) 150px\" src=\"https:\/\/tophighmachinery.com\/wp-content\/uploads\/2025\/11\/qt10-15-automatic-block-machin20-1024x683.jpg\" alt=\"qt10 15 automatic block machin20\" class=\"uag-image-2644\" width=\"1024\" height=\"683\" title=\"qt10 15 automatic block machin20\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n<div data-block-name=\"woocommerce\/product-categories\" class=\"wp-block-woocommerce-product-categories wc-block-product-categories is-list \" style=\"\"><ul class=\"wc-block-product-categories-list wc-block-product-categories-list--depth-0\">\t\t\t\t<li class=\"wc-block-product-categories-list-item\">\t\t\t\t\t<a style=\"\" href=\"https:\/\/tophighmachinery.com\/es-mx\/product-category\/automaticblock-making-machine\/\"><span class=\"wc-block-product-categories-list-item__name\">m&aacute;quina autom&aacute;tica para hacer bloques<\/span><\/a><span class=\"wc-block-product-categories-list-item-count\"><span aria-hidden=\"true\">7<\/span><span class=\"screen-reader-text\"><span class=\"mars-pro\" data-o=\"7 products\">7 products<\/span><\/span><\/span>\t\t\t\t<\/li>\t\t\t\t\t\t\t<li class=\"wc-block-product-categories-list-item\">\t\t\t\t\t<a style=\"\" href=\"https:\/\/tophighmachinery.com\/es-mx\/product-category\/clay-block-making-machine\/\"><span class=\"wc-block-product-categories-list-item__name\">M&aacute;quina para fabricar bloques de arcilla<\/span><\/a><span class=\"wc-block-product-categories-list-item-count\"><span aria-hidden=\"true\">4<\/span><span class=\"screen-reader-text\"><span class=\"mars-pro\" data-o=\"4 products\">4 products<\/span><\/span><\/span>\t\t\t\t<\/li>\t\t\t\t\t\t\t<li class=\"wc-block-product-categories-list-item\">\t\t\t\t\t<a style=\"\" href=\"https:\/\/tophighmachinery.com\/es-mx\/product-category\/moving-block-making-machine\/\"><span class=\"wc-block-product-categories-list-item__name\">m&aacute;quina para hacer bloques m&oacute;vil<\/span><\/a><span class=\"wc-block-product-categories-list-item-count\"><span aria-hidden=\"true\">4<\/span><span class=\"screen-reader-text\"><span class=\"mars-pro\" data-o=\"4 products\">4 products<\/span><\/span><\/span>\t\t\t\t<\/li>\t\t\t\t\t\t\t<li class=\"wc-block-product-categories-list-item\">\t\t\t\t\t<a style=\"\" href=\"https:\/\/tophighmachinery.com\/es-mx\/product-category\/other-construction-equipments\/\"><span class=\"wc-block-product-categories-list-item__name\">otras maquinarias de construcci&oacute;n<\/span><\/a><span class=\"wc-block-product-categories-list-item-count\"><span aria-hidden=\"true\">5<\/span><span class=\"screen-reader-text\"><span class=\"mars-pro\" data-o=\"5 products\">5 products<\/span><\/span><\/span>\t\t\t\t<\/li>\t\t\t\t\t\t\t<li class=\"wc-block-product-categories-list-item\">\t\t\t\t\t<a style=\"\" href=\"https:\/\/tophighmachinery.com\/es-mx\/product-category\/semi-automatic-block-making-machine\/\"><span class=\"wc-block-product-categories-list-item__name\">M&aacute;quina semiautom&aacute;tica para hacer bloques<\/span><\/a><span class=\"wc-block-product-categories-list-item-count\"><span aria-hidden=\"true\">4<\/span><span class=\"screen-reader-text\"><span class=\"mars-pro\" data-o=\"4 products\">4 products<\/span><\/span><\/span>\t\t\t\t<\/li>\t\t\t<\/ul><\/div><","protected":false},"excerpt":{"rendered":"<p>Calculando el Plan Espacial para una Planta de Bloques El &aacute;rea total requerida es la suma de varias zonas interconectadas. Una f&aacute;brica bien dise&ntilde;ada facilita un flujo de material lineal y fluido, desde la entrada de materia prima hasta el despacho del producto terminado. 1. Zona de Producci&oacute;n Principal: El Coraz&oacute;n de las Operaciones Esta [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3830","post","type-post","status-publish","format-standard","hentry","category-news"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"woocommerce_thumbnail":false,"woocommerce_single":false,"woocommerce_gallery_thumbnail":false},"uagb_author_info":{"display_name":"admin@yingchengchina.com","author_link":"https:\/\/tophighmachinery.com\/es-mx\/author\/adminyingchengchina-com\/"},"uagb_comment_info":0,"uagb_excerpt":"Calculando el Plan Espacial para una Planta de Bloques El &aacute;rea total requerida es la suma de varias zonas interconectadas. Una f&aacute;brica bien dise&ntilde;ada facilita un flujo de material lineal y fluido, desde la entrada de materia prima hasta el despacho del producto terminado. 1. Zona de Producci&oacute;n Principal: El Coraz&oacute;n de las Operaciones Esta&hellip;","_links":{"self":[{"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/posts\/3830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/comments?post=3830"}],"version-history":[{"count":1,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/posts\/3830\/revisions"}],"predecessor-version":[{"id":3831,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/posts\/3830\/revisions\/3831"}],"wp:attachment":[{"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/media?parent=3830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/categories?post=3830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tophighmachinery.com\/es-mx\/wp-json\/wp\/v2\/tags?post=3830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}