1). Raw material: use hopper trolley deliver into mixer; need 2 workers
2). Mixer: Mixing and produce concrete, then conveyor deliver concrete to block machine hopper; need 1 worker
3). Hollow block machine: Forming blocks, then deliver to stacker by block receiver; no need workers
4). Manual forklift trolley: deliver newly made blocks to curing area; need 2 workers
5). Curing area: Curing need 10-15 days, then take blocks out from pallet;
6). Trolley: deliver pallet to hollow block machine area; need 1 worker
7). Sell blocks: Sell blocks and management; 1 worker
Total need about 5-6 workers in QT4-25 hollow block machine factory.




|
A
|
JQ500 Mixer power,11KW
|
QT4-25 Host machine total power
|
18.6KW
|
|
|
B
|
6m conveyor
|
Molding cycle
|
20s
|
|
|
C
|
Stacker, it could layer 2-3 pallets blocks
|
Vibration frequency
|
4000-4800HZ
|
|
|
D
|
6m conveyor
|
Vibration force
|
50-60KN
|
|
|
Color feeder system
(Optional) |
QT4-25 Color feeder machine–Automatic hydraulic machine
|
Host brick machine size
|
3410*2200*2100mm
|
|
|
Color mixer–1.2m; 7kw
|
Weight
|
4000KGS
|
||
|
6m conveyor
|
Pallet size
|
850*550mm
|
|
Item
|
Block
|
Production capacity
|
Photo
|
|
1
|
Hollow/Solid block
400-200-200mm |
4 pcs/mold
4608 pcs/8h |
|
|
2
|
Hollow/Solid block
400-150-200mm |
5 pcs/mold
5760 pcs/8h |
|
|
3
|
Hollow/Solid block
400-100-200mm |
7 pcs/mold
8064 pcs/8h |
|
|
4
|
Houdi block
450-120-200mm |
6 pcs/mold
6912 pcs/8h |
|
|
5
|
S shape paver
225-112.5-60mm |
12 pcs/mold
13824 pcs/8h |
|
|
6
|
I shape paver
200-160-60mm |
8 pcs/mold
9216 pcs/8h |
|
|
7
|
Holland paver
200-100-60mm |
12 pcs/mold
13824 pcs/8h |